(412) 487-2133
fax (412) 487-3973
Current Jobs
Allison Park's logo










District 11Bridge Maintenance - District 12
ECMS 87341


This contract encompasses the four counties (Washington, Westmoreland,
Greene, and Fayette) in District 12.
 The repairs included, but not limited
to, steel, concrete deck, concrete substructure,
bearing, and miscellaneous
 repairs.  The crews would remain on one bridge
for months at a time
or be at several different sites within a few weeks.  



















Squaw RunECMS #78187 - Squaw Run



Allison Park Contractors is responsible for relining the culvert that houses Squaw Run, near Blawnox, PA.  Over a thousand feet of pipe, at 6'-6" diameter, will be inserted into the existing 7'-6" pipe.  The void between the two pipes will then be grouted for the entire length of the culvert.












Squaw RunECMS #27263  S.R. 65 & Burtner Road



For the milling and resurfacing, guide rail, curb and sidewalk, pavement marking, deck replacement, steel repairs, painting structural steel, substructure concrete repairs, resetting bearings, concrete crack and spall repairs, and other miscellaneous construction, all within a length of 2,595 linear feet (0.492 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0065, SECTION A40 (Ohio River Boulevard) and STATE ROUTE 1032, SECTION A04 (Burtner Road), in ALLEGHENY COUNTY, AVALON BOROUGH and HARRISON TOWNSHIP, Commonwealth of Pennsylvania.

.


















Home | Contacts | Equipment | Experience | About UsCurrent Jobs
Powered by thesitewizard.com
Created by Adam Meek